May 14, 2014
Installer is very good with tile and cabinet install. The main problem I had was slowness. Took approx 4 months to do a bath remodel (did two of them) due to time to get materials. Even the one that had no replacement cabinets involved started late November, early December and was finally finished in April. Have two additional jobs with flooring in progress and the follow up on when materials are to be in, or are in, isn't good. Have to call or check in myself for updates..after checking and told i would get a call in one or two days, that call never came.
- Jan1
Pendleton, OR, 97801
May 14, 2014
Pendleton, OR, 97801

